Inside a contained waste pump skid engineered, built and FAT tested entirely off-site for a pharmaceutical client — from design brief to single-lift installation.
Process waste systems are some of the hardest elements to de-risk on a live pharmaceutical or life sciences site. Pump skids, neutralisation systems, effluent tanks — on a conventional build, each pulls in its own mix of mechanical, electrical, instrumentation and controls subcontractors, all competing for space, sequencing and site supervision time on a programme that has no room to absorb delay.
This case study looks at how Kent OSM approached one of these systems differently: a contained waste pump skid built for a pharmaceutical client, handling an OEB4 product as an integral module on a lift station. Rather than treat it as a bundle of separate deliveries to be coordinated on site, Kent OSM engineered, built, wired and tested the entire module as one complete system — off-site, under one roof — and delivered it ready for a single lift into place.
The Brief
The client didn't come to Kent Stainless asking for a specific product off a catalogue. They came with a process challenge: safely contain and manage waste from an OEB4 product within a lift station module, without adding complexity, coordination risk or programme delay to an already demanding pharmaceutical build.
That's a familiar starting point for Kent OSM. Across Life Sciences, Surface Protection and public realm work, the projects that end up on our floor rarely arrive as a finished specification — they arrive as a problem that needs an engineered answer.
The Challenge: Too Many Moving Parts For One Site
Built conventionally, a module like this involves mechanical trades installing pumps, valves and pipework; electrical contractors wiring a marshalling panel to site standard; instrumentation specialists fitting level, pressure and temperature monitoring; and a containment strategy that has to be verified, commissioned and signed off before the wider process line can go live.
Each of those trades has its own schedule, its own access requirements and its own risk of running late. On a live pharmaceutical site, a delay in any one of them cascades into the rest of the programme — and a mistake discovered during on-site commissioning is far more expensive, in time and money, than one caught on a workshop floor.
You bring us the problem. We engineer the system.
The Kent OSM Approach
Kent OSM took ownership of the entire scope as a single engineered module. The design was developed directly from the client's process requirements — 3D modelled, detailed and released to manufacture in-house — then built, wired and piped to site standard at our facility in Wexford.
Critically, Kent Stainless took on full subcontractor management for the build: every mechanical, electrical and instrumentation trade that would otherwise have queued for access on a live site instead worked to Kent's own programme, in a controlled workshop environment, with Kent carrying responsibility for the coordination between them.
Inside the Module
What's Packed Into This Skid
The finished module is dense with engineered scope — everything a conventional on-site build would have delivered piecemeal, integrated here into one containment envelope:
- Contained pumping locker
- Duty/standby AODD pumps
- Pulsation dampening
- Custom pump control
- Process flow control & monitoring
- Temperature monitoring
- Pressure control
- System interlocks
- Tank recirculation
- Tank and sump level control
- Spray ball control for tank cleaning
- System wash-down reel
- Instrument air
- AODD pump for sump level control
- Tank ventilation
- Piping and containment to spec
- Fully wired marshalling panel to site standard, ready for BAS connection
Proven Before It Ever Left The Factory
Every module Kent OSM builds is backed by full quality and documentation compliance, and this one was no exception: the client's own engineers travelled to Wexford to witness Factory Acceptance Testing (FAT) before the module was cleared for dispatch, with Site Acceptance Testing (SAT) support available once it reached the client's plant.
That matters more than it might sound. Proving pumps, controls, interlocks and containment work together as a system — on a workshop floor, with the manufacturer's own engineers on hand — means there are no surprises left for the site team to discover during a live commissioning window. The risk gets retired early, where it's cheapest and safest to fix.
One Lift. Seamless Integration.
The finished module was designed from the outset for a single lift and drop-in site integration. Rather than a multi-week programme of on-site mechanical, electrical and instrumentation works, installation became a single, carefully rigged lift directly into position — safer for everyone on site, and dramatically shorter than the conventional alternative.
Taking a project off-site takes it off the critical path.
The Result
The module is now complete and in operation on the client's site — a contained, fully engineered waste pump skid that never had to be assembled, wired or proven under the pressure of a live construction programme. For the client, that meant a shorter, safer and more predictable path to a working system. For their design team, it meant one fewer piece of complex, multi-discipline scope to coordinate on site.
It's a fair example of what Kent OSM does across every process waste module we build: engineering design quality, combined with world-class craftsmanship, delivered as one system that punches well above its footprint — and takes the risk off your critical path in the process.
Specifying A Process Waste Module?
Talk to us at concept or detailed design stage, and we'll take on the subcontractor management, the build and the testing — off-site, on programme.